JBCONSTRUCTION has commissioned us to carry out assembly work on the steel structure of the W1 shelter and auxiliary buildings. The project, with an area of 11,000 sqm and a tonnage of 889 tonnes, was carried out on the site of the Poland-Ukraine road border crossing located in Dołhobyczów, in the Lublin Voivodeship.